Training and Qualification of Bolted Joint Assembly Personnel

For quite some time now, Section VIII Division 1 of the ASME Boiler & Pressure Vessel Code has included the following provision in Appendix 2-15: 2-15 QUALIFICATION OF ASSEMBLY PROCEDURES AND ASSEMBLERS It is recommended that flange joints designed to this Appendix be assembled by qualified procedures and by qualified assemblers. ASME PCC-1 may be […]

Continue Reading

Pump Trips and Check Valve Closure

Pump Trips and Check Valve Closure Systems running multiple pumps in parallel can undergo serious equipment and piping damage during a pump trip caused by a power outage or pump mechanical failure. Uncontrolled reverse flow in the system can occur and if improperly selected check valves are used it can result in pumps running backwards […]

Continue Reading

Pressure Vessel Fitness for Service

A major oil company revitalizing an Iraqi oil field called on Becht Engineering to review several hundred pressure vessels containing thinned regions to determine their fitness for service (FFS) per the API-579-1/ASME-FFS-1 Part 5 process for analyzing Local Thin Areas (LTAs). Using ultrasonic testing (UT) and visual inspection data, Becht Engineering customized its proprietary API-579-1/ASME-FFS-1 […]

Continue Reading
Let Becht Turn Your Problem
Into Peace of Mind