Elastic Follow-up Can Result in Failures in Systems that Comply with Piping Code Rules

The analysis procedures in the Code essentially assume that the strain range in the system can be determined from an elastic analysis. That is, strains are proportional to elastically calculated stresses. The stress range is limited to less than two times the yield stress, in part to achieve this. However, in some systems, strain concentration […]

Continue Reading

The Becht Expert Witness – A Partner with Credibility

In any legal case it is very important to establish a true partnership between the law firm and the expert witness. This partnership facilitates an effective, balanced team with both technical and legal knowledge. This will provide the client with the most cost-effective solution and best chance for a favorable outcome during trial or arbitration.  […]

Continue Reading

Securing the Right Expert to Support Your Lawsuit

On March 25, 2016 I published a Blog titled “Expert Witness, a Becht Engineering Service to Avoid”. This Blog focused on a number of elements that can be used to assure projects do not result in litigation. These elements include: Developing a sound, complete scope of work Selecting a qualified contractor Using proven industry standards […]

Continue Reading

Fluid Catalytic Cracking (FCC) Transfer Line Flexibility – Analysis and Design Considerations

FCC’s are complex units – and the design of their transfer lines has some unique considerations. While many of the lines are refractory lined to permit construction with carbon steel piping, some sections are hot walled, at temperatures well into the creep range, for the purpose of balancing thermal expansion or, in the case of piping […]

Continue Reading

Risk Assessment of Refinery Hydroprocessing Unit Reactor Effluent Air Coolers (REACs) Made of Duplex Stainless Steel (DSS)

Cracking of REAC Duplex Stainless Steel Failures of Refinery Hydroprocessing Unit REACs made of 2205 DSS have in some cases resulted in significant plant damage and extended outages for repairs.  In a few  cases, header box welds have ruptured.  Additionally, failures have occurred at tube-to-tubesheet welds and in REAC inlet and outlet piping made of […]

Continue Reading

A Dimensional Execution Plan – Measure Up To Project Expectations

Plan the Work and Work the Plan I am confident that we can agree that it is essential for all projects to have an execution plan to be successful. We have all heard the common phrase, “Plan the Work and Work the Plan.” Many have been participants in strategy meetings discussing the most effective and […]

Continue Reading

Treat Reliability Like …

This blog outlines ways to think about reliability to help drive a culture of continuous improvement.  It is the fourth in a series of Blogs on improving plant reliability performance through changes in culture, programs, equipment design, maintenance and operation. The principles we applied in implementing successful reliability programs in a number of operating plants […]