Risk-Based Work Selection (RBWS) – Choosing a Software Tool

Using the right software tool can save time and improve results of Risk Based Work Selection (RBWS) which is a standalone work process aimed at optimizing turnaround (TA) work scopes.  RBWS uses risk assessments to determine if individual worklist items are justified by Health, Safety, & Environmental Risks or Financial Risks.  Significant reductions in turnaround […]

Continue Reading

All That Glitters Is Not Gold – Due Diligence Can Define The True Value

A few years ago I conducted what might be the world’s cheapest, fastest and most cost effective due diligence study ever done. This study took one hour and cost the client about $500.  I was approached by two new members of a well-recognized financial institution. They were assigned to evaluate opportunities to capture low cost […]

Continue Reading

Fatal Distractions: Refinery Chloride Contamination – Are You Looking for the Source of Chlorides in the Right Place?

On December 29, 1972 one the Nation’s worst airline accidents occurred as Eastern Air Lines Flight 401 crashed into the Florida Everglades killing 101 of the passengers and crew.   A National Transportation Safety Board (NTSB) investigation attributed the cause of the crash to crew distraction.  While on approach, the crew noted that a landing gear […]

Continue Reading

Reducing Loss of Primary Containment (LOPC’s) in a Refinery

Reducing Loss of Primary Containment (LOPC’s) or commonly referred to as “leaks” in a refinery is a key factor to improve reliability.  Historically, most refiners reduced the high consequence leaks to avoid major incidents; however, lower consequence related leaks were not given high priority.  Today high reliability is required, and reduction of all leaks is […]

Continue Reading

Why Risk-Based Inspection (RBI) Works

The API Inspection Codes were originally based on failure prevention and did not consider the consequences of failure or potential damage mechanisms.  Risk-based inspection (RBI) assessments result in an equipment risk ranking based on the probability of failure (a leak occurring) and the consequence associated with that leak.  Applied properly, RBI provides the benefit of […]

Continue Reading

Normalization of Deviance – The Pathway to Disaster

On February 1, 2003 the Space Shuttle Columbia, while entering the earth’s atmosphere at 10,000 miles per hour, disintegrated killing all 7 astronauts. A $4 billion spacecraft was destroyed, spreading debris over 2000 square miles and grounding the Space Shuttle program for 2-1/2 years. The cause, normalization of deviance. Insulating foam strikes which had been […]

Continue Reading

Mentoring Nuclear Power Plant Engineers

As the Nuclear Power Plant workforce continues to age, it is imperative that nuclear plant supervisors and managers use as many tools as possible to mentor younger engineers. This article discusses several ways proven to be successful in mentoring younger engineers as a means of filling the voids created by the retirements of senior workforce […]

Continue Reading
Let Becht Turn Your Problem
Into Peace of Mind